Use this procedure to configure link-state tracking using EDM.
Procedure
- From the navigation
tree, double-click Edit.
- In the Edit tree, click Link State Tracking.
- To enable or disable
the group, double-click the cell in the Enabled column.
- To modify the upstream
port list for the group, double-click the cell in the UpstreamPortList column.
- Click the buttons that
correspond to the ports that are to be added or deleted. Click All to select all ports.
- Click Ok.
- To modify the downstream
port list for the group, double-click the cell in the DownstreamPortList column.
- Click the buttons that
correspond to the ports that are to be added or deleted. Click All to select all ports.
- Click Ok.
- To modify the upstream
MLT list for the group, double-click the cell in the UpstreamMltList column.
- Click the buttons that
correspond to the trunks that are to be added or deleted. Click All to select all ports.
- Click Ok.
- To modify the downstream
MLT list for the group, double-click the cell in the DownstreamMltList column.
- Click the buttons that
correspond to the trunks that are to be added or deleted. Click All to select all ports.
- Click Ok.
- Click Apply.